Sewage System works of Ph 2 package 3 at ROO HQ

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore.
Learn More

Construction the new ACP for Janubia DS

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore.
Learn More

new project

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a
Learn More
Year Project with details Location Client
2023 Construction the new ACP for Janubia DS The SoW included: Construction the new security access control point at Janubia, the work includes constructing design the new access building, new CoW building,  new ablution building and car park shades Basra/ South Rumaila Rumaila Operating Organization
2023 Construction the new ACP for M.Qurainat DS The SoW included: Construction the new ACP for M.Qurainat, the work include constructing design  the new access building,  new CoW building,  new ablution building and car park shades Basra/ South Rumaila Rumaila Operating Organization
2023 Construction the new ACP for Qurainat DS The SoW included: Construction the new ACP for Qurainat, the work include constructing design the new access building, new CoW building, new ablution building and car park shades Basra/ South Rumaila Rumaila Operating Organization
2023 Construction the new ACP for Markazia DS The SoW included: Construction the new ACP for Qurainat, the work include constructing design the new access building, new CoW building, new ablution building and car park shades Basra/ South Rumaila Rumaila Operating Organization
2023 Construction the new ACP for Ratqa DS The SoW included: Construction the new ACP for Qurainat, the work include constructing design the new access building, new CoW building, new ablution building and car park shades Basra/ South Rumaila Rumaila Operating Organization
2023 Construction the new ACP for QAWTP The SoW included: Construction the new ACP for QA, the work includes design and construction the new access building, Dog Kennal, and new access gate. Basra Qarmat Ali Rumaila Operating Organization
2023 Road Resurfacing for ROO HQ The SoW included: Road Resurfacing for ROO HQ phase 1, the work included  Sewage manhole cover, Storm water Gully, Side daring, ROAD CROSSING, KERB, SOAKAWAY, paving asphalt 5 CM Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2023 Supplying 20 cabins for OPFs The SoW included: Fabricate and deliver cabins with furniture for OPFs Basra/ South Rumaila ROO- RSB Rumaila Operating Organization
2023 ROOHQ Ph2 paving work of road package 3 The SoW included: ROOHQ Phase 2 road package 3 the work includes paving, kerbing, backfilling, levelling and compaction. include of supply and install kerb, foundation to kerb mass concrete, hanching per side and Supply Cement stabilized sub-base; complete as per Specification Depth; 150 mm Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2022 Power and street lights of parking area and road package 3 at ROO HQ The SoW included: street lights of parking area and road package 3 at ROO HQ the works include, excavation works, ducting, cabling works supplying and installing lighting posts with fixture Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2022 Phase 2 parking area landscaping works The SoW included: The works include excavation works, supply Sub-base backfilling with compaction Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2022 Enabling work of the new WACP at ROOHQ The SoW included: Enabling work in order to construct the new WACP ROOHQ the work included but not limited to paving, backfilling levelling and compaction Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2022 Road crossing in roads J, D and C at ROOHQ PH2 The SoW included: Road crossing in roads at ROOHQ PH2, the work includes construct ducting required for ROOHQ Phase 2 utilities water, irrigation, ELV duct and cable Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2022 Sewage System works of Ph 2 package 3 at ROO HQ The SoW included: Site Preparation- Review the engineering plans and specifications for the sewage system. Conducted a site survey to identify existing utilities, underground structures, and any potential obstacles that may affect the installation. Cleared the work area of debris, vegetation, and obstructions to allow for smooth excavation and installation. Excavation and Trenching- Excavate trenches according to the approved design and specifications. Ensure that the trenches have the correct dimensions and gradient to facilitate proper flow of sewage. Excavate additional pits or manholes at strategic locations to provide access for maintenance and inspection. Installation of Sewage Pipes- Select the appropriate type and size of sewage pipes as specified in the design. Lay the pipes in the excavated trenches, ensuring proper alignment and slope for efficient sewage flow. Connected the pipes using suitable fittings and secure them properly to prevent dislocation or separation. Installation of Inspection Chambers and Manholes- Install inspection chambers or manholes at regular intervals along the sewage system. Ensure that the chambers or manholes are properly aligned with the pipes and positioned at suitable depths for easy access and maintenance. Backfilling and Compaction- Backfill the excavated trenches with Sub-base type B, compaction them in layers to ensure stability and prevent settlement. Follow proper compaction procedures to achieve the required density and avoid future ground subsidence. Testing and Commissioning- Conducted testing to ensure the sewage system is functioning correctly. Inspected the entire system for leaks, blockages, or other defects. Tested the flow and performance of the system under varying loads and conditions. As-Built Documentation- Prepare accurate as-built drawings and documentation, reflecting any changes made during the installation process. Provide the as-built documentation to the project management team for record-keeping and future reference.   Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2022 Stormwater Drainage works of Ph 2 Package 3 part 1at ROO HQ The SoW included: Site Preparation – Review the engineering plans and specifications for the storm water drainage system. Conduct a site survey to identify existing utilities, underground structures, and any potential obstacles that may affect the installation. Clear the work area of debris, vegetation, and obstructions to allow for smooth excavation and installation. Excavation and Trenching- Excavate trenches according to the approved design and specifications. Ensure that the trenches have the correct dimensions and gradient to facilitate proper water flow. Excavate additional sumps or catch basins at strategic locations to collect excess water. Installation of Drainage Pipes- Select the appropriate type and size of pipes as specified in the design. Lay the pipes in the excavated trenches, ensuring proper alignment and slope for efficient water flow. Connect the pipes using suitable fittings and secure them properly to prevent dislocation or separation. Installation of Inspection Chambers- Install inspection chambers at regular intervals along the drainage system. Ensure that the inspection chambers are properly aligned with the pipes and positioned at suitable depths for easy access and maintenance. Backfilling and Compaction- Backfill the excavated trenches with Sub-base Type B, compacting them in layers to ensure stability. Follow proper compaction procedures to achieve the required density and avoid future ground subsidence Manhole Construction- Construct manholes at designated locations for access to the drainage system. Build the manholes according to the design specifications, ensuring they are structurally sound and watertight. Install appropriate covers or gratings on the manholes to prevent debris access. Testing and Commissioning- Conduct hydrostatic testing to ensure the drainage system is functioning correctly. Inspect the entire system for any leaks, blockages, or other defects. As-Built Documentation- Provide the as-built documentation to the project management team for record-keeping and future reference. Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2021 Power and street lights of parking area and road package 2 The SoW included: Electrical works and Lighting works required for the new roads at ROO HQ Phase2, the works include, excavation works, concrete foundation for poles, ducting, cabling works and supplying and installing lighting posts with fixture. Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2021 Connecting Ph 2 street lights of road package 1 with power supply at ROO HQ The SoW included: Connect the new street lights for road package 1 at ROO HQ Ph 2 with power supply, works include excavation, supply and install cables and modification works for the MDP Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2021 Phase 2 parking area landscaping works The SoW included: The works include excavation works, supply Sub-base backfilling with compaction Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2021 Additional road crossing at ROOHQ phase2 road The SoW include: Road crossing which required 11KV power supply routes which will be for connecting ROOHQ with main power supply, the work includes excavation work, formwork and reinforcement with cast concrete Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2021 Construction new camp for IA near ROO HQ,   Construction Preparation, Prepare the site where the cabins will be installed. This includes clearing the area, leveling the ground, and start work infrastructure Sewage, portable water, electrical and cast concrete foundations are in place, Cabin Construction, Assemble and construct the cabins according to the design and specifications, Install necessary utilities such as electricity, plumbing, heating, and ventilation systems in each cabin.   Basra/ South Rumaila Near- ROOHQ Rumaila Operating Organization
2021 Storm water Drainage works of Ph 2 Parking Area part 2 at ROO HQ, The SoW included Earthworks (excavations and backfilling), Soakaway and pipes connection pipes with manholes,   Site Preparation – Review the engineering plans and specifications for the storm water drainage system. Conduct a site survey to identify existing utilities, underground structures, and any potential obstacles that may affect the installation. Clear the work area of debris, vegetation, and obstructions to allow for smooth excavation and installation. Excavation and Trenching- Excavate trenches according to the approved design and specifications. Ensure that the trenches have the correct dimensions and gradient to facilitate proper water flow. Excavate additional sumps or catch basins at strategic locations to collect excess water. Installation of Drainage Pipes- Select the appropriate type and size of pipes as specified in the design. Lay the pipes in the excavated trenches, ensuring proper alignment and slope for efficient water flow. Connect the pipes using suitable fittings and secure them properly to prevent dislocation or separation. Installation of Inspection Chambers– Install inspection chambers at regular intervals along the drainage system. Ensure that the inspection chambers are properly aligned with the pipes and positioned at suitable depths for easy access and maintenance. Backfilling and Compaction- Backfill the excavated trenches with Sub-base Type B, compacting them in layers to ensure stability. Follow proper compaction procedures to achieve the required density and avoid future ground subsidence Manhole Construction- Construct manholes at designated locations for access to the drainage system. Build the manholes according to the design specifications, ensuring they are structurally sound and watertight. Install appropriate covers or gratings on the manholes to prevent debris access. Testing and Commissioning- Conduct hydrostatic testing to ensure the drainage system is functioning correctly. Inspect the entire system for any leaks, blockages, or other defects. As-Built Documentation- Provide the as-built documentation to the project management team for record-keeping and future reference.   Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2021 Sewage System works of Ph 2 Parking Area part 2 at ROO HQ, The SoW included: Earthworks (excavations and backfilling), piping, supply and install Pre-cast Manhole Site Preparation- Review the engineering plans and specifications for the sewage system. Conducted a site survey to identify existing utilities, underground structures, and any potential obstacles that may affect the installation. Cleared the work area of debris, vegetation, and obstructions to allow for smooth excavation and installation. Excavation and Trenching- Excavate trenches according to the approved design and specifications. Ensure that the trenches have the correct dimensions and gradient to facilitate proper flow of sewage. Excavate additional pits or manholes at strategic locations to provide access for maintenance and inspection. Installation of Sewage Pipes- Select the appropriate type and size of sewage pipes as specified in the design. Lay the pipes in the excavated trenches, ensuring proper alignment and slope for efficient sewage flow. Connected the pipes using suitable fittings and secure them properly to prevent dislocation or separation. Installation of Inspection Chambers and Manholes- Install inspection chambers or manholes at regular intervals along the sewage system. Ensure that the chambers or manholes are properly aligned with the pipes and positioned at suitable depths for easy access and maintenance. Backfilling and Compaction- Backfill the excavated trenches with Sub-base type B, compaction them in layers to ensure stability and prevent settlement. Follow proper compaction procedures to achieve the required density and avoid future ground subsidence. Testing and Commissioning- Conducted testing to ensure the sewage system is functioning correctly. Inspected the entire system for leaks, blockages, or other defects. Tested the flow and performance of the system under varying loads and conditions. As-Built Documentation- Prepare accurate as-built drawings and documentation, reflecting any changes made during the installation process. Provide the as-built documentation to the project management team for record-keeping and future reference.   Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2021 Installing HSF around ROO HQ The SoW included: Supply and Installing HSF around ROO HQ the works include Ground preparation works, excavation, reinforcement concrete and installation fence with razor coil installation     Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2021 ROO HQ Ph II Paving works of Roads Package 1&2 (Base layer) The SoW included: Work includes the supply sub-base type B backfilling leveling and grading with compaction and paving asphalt 100mm   Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2021 Supplying and installing Accommodation cabins for SR Residence The SoW included: (Works include: Site preparation works Supplying and installing cabins 12 X4 m MEP works Shades Supplying and installing concrete T-walls and gates also include supply and install ablution block cabin 10×4, Fire approved cabin, Water pump, shade, pipes PPR, Manholes, Septic tank, Sewage system, Flag pole,)     Basra/ South Rumaila   Rumaila Operating Organization
2020 The Enabling and Backfilling Works for Phase 2 Roads at ROO HQ The SoW included: (Clearing site vegetation, Levelling and grading works, Backfilling, Supply Sub‐ base; Type A& B Compaction and Supply Cement stabilised sub‐base; complete as per Specification Depth; 150 mm)   Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2020 Sewage System works of Ph 2 Parking Area part 2 at ROO HQ, The SoW included: Earthworks (excavations and backfilling), piping, supply and install Pre-cast Manhole Site Preparation- Review the engineering plans and specifications for the sewage system. Conducted a site survey to identify existing utilities, underground structures, and any potential obstacles that may affect the installation. Cleared the work area of debris, vegetation, and obstructions to allow for smooth excavation and installation. Excavation and Trenching- Excavate trenches according to the approved design and specifications. Ensure that the trenches have the correct dimensions and gradient to facilitate proper flow of sewage. Excavate additional pits or manholes at strategic locations to provide access for maintenance and inspection. Installation of Sewage Pipes- Select the appropriate type and size of sewage pipes as specified in the design. Lay the pipes in the excavated trenches, ensuring proper alignment and slope for efficient sewage flow. Connected the pipes using suitable fittings and secure them properly to prevent dislocation or separation. Installation of Inspection Chambers and Manholes- Install inspection chambers or manholes at regular intervals along the sewage system. Ensure that the chambers or manholes are properly aligned with the pipes and positioned at suitable depths for easy access and maintenance. Backfilling and Compaction- Backfill the excavated trenches with Sub-base type B, compaction them in layers to ensure stability and prevent settlement. Follow proper compaction procedures to achieve the required density and avoid future ground subsidence. Testing and Commissioning- Conducted testing to ensure the sewage system is functioning correctly. Inspected the entire system for leaks, blockages, or other defects. Tested the flow and performance of the system under varying loads and conditions. As-Built Documentation- Prepare accurate as-built drawings and documentation, reflecting any changes made during the installation process. Provide the as-built documentation to the project management team for record-keeping and future reference.   Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2020 Storm water Drainage works of Ph 2 Parking Area part 2 at ROO HQ, The SoW included: Earthworks (excavations and backfilling), Soakaway and pipes connection pipes with manholes,   Site Preparation – Review the engineering plans and specifications for the storm water drainage system. Conduct a site survey to identify existing utilities, underground structures, and any potential obstacles that may affect the installation. Clear the work area of debris, vegetation, and obstructions to allow for smooth excavation and installation. Excavation and Trenching- Excavate trenches according to the approved design and specifications. Ensure that the trenches have the correct dimensions and gradient to facilitate proper water flow. Excavate additional sumps or catch basins at strategic locations to collect excess water. Installation of Drainage Pipes- Select the appropriate type and size of pipes as specified in the design. Lay the pipes in the excavated trenches, ensuring proper alignment and slope for efficient water flow. Connect the pipes using suitable fittings and secure them properly to prevent dislocation or separation. Installation of Inspection Chambers– Install inspection chambers at regular intervals along the drainage system. Ensure that the inspection chambers are properly aligned with the pipes and positioned at suitable depths for easy access and maintenance. Backfilling and Compaction- Backfill the excavated trenches with Sub-base Type B, compacting them in layers to ensure stability. Follow proper compaction procedures to achieve the required density and avoid future ground subsidence Manhole Construction- Construct manholes at designated locations for access to the drainage system. Build the manholes according to the design specifications, ensuring they are structurally sound and watertight. Install appropriate covers or gratings on the manholes to prevent debris access. Testing and Commissioning- Conduct hydrostatic testing to ensure the drainage system is functioning correctly. Inspect the entire system for any leaks, blockages, or other defects. As-Built Documentation- Provide the as-built documentation to the project management team for record-keeping and future reference.   Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2020 Survey and fence installation works at ROO HQ Phase 2 The SoW included: Topo-survey works and installing temporary fence around phase 2 area at ROO HQ Fee Basis: Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2020 Repairing Damaged Concrete of the RSB Laydown Areas The SoW included: Repairing Damaged Concrete of the RSB Laydown Areas Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2020 Programming and Replacing PLC system for the security glare lights The SoW included: Programming and Replacing PLC system for the security glare lights Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2020 Supplying and installing PLC touch screen for. the security glare lights at ROO HQ The SoW included: Supplying and installing PLC touch screen for the security glare lights at ROO HQ     Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2019 Purchasing High Security Fence (HSF) The SoW included: Supply High Security Fence Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2019 Replacing AC units for the CDK The SoW included: Replace the existing cassette type AC units with 4 No. ACs units (48000 BTU) 4 tons cassette type in kitchen No.1 at CDK, the works include, removing, supplying and installing. Basra/ South Rumaila   Rumaila Operating Organization
2019 Replacing the damaged industrial exhaust fans for the CDK The SoW included: Replace the existing 10 No. damaged exhaust fans (industrial type) inside the CDK, works include removing the damaged fans with ducts and accessories, supplying and installing new radial fans with all the requirements (ducts, stands and wiring). Basra/ South Rumaila   Rumaila Operating Organization
2019 Concrete Works & Pile Caps for Permanent Acid Injection @ QA2PU-   Basra/ Qarmat Ali Water Treatment Plan Rumaila Operating Organization
2019 Supplying and installing high security fence around DS04 The SoW included: Supply and install high security fence at DS04 (about 2120m) as part of DS4 Major Refurbishment Works Basra/ North Rumaila   Rumaila Operating Organization
2019 Signage and road marking of SR fire station The SoW included: Signage and road marking of SR fire station Basra/ South Rumaila   Rumaila Operating Organization
2019 Fire Station project- The SoW included: Asphalt paving works for the external road of SR fire station. WORKs will include: – Grading and compaction work – Backfilling with compaction and testing – Asphalt paving works (base layer 100mm thick)     Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2018 Surface layer paving for Markazia road The SoW included: Repair and extension the Road in side DS with paving surface layer     Basra/ South Rumaila   Rumaila Operating Organization
2018 Rumaila Roads repair asphalt and concrete work The SoW included: The work includes repair of Rumaila spine road and some of wells asphalt access road work include remove damage asphalt, work formwork and reinforcement and cast concrete       Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2017 Extend check point Blue 59 The SoW included: Work includes the supply sub-base type B backfilling leveling and grading with compaction and paving asphalt of the new access checkpoint) Basra/ South Rumaila ROOHQ     Rumaila Operating Organization
2017 Extend the South Rumaila Check point 67 The SoW included: Work includes the supply sub-base type B backfilling leveling and grading with compaction and paving asphalt of the new access checkpoint)   Basra/ South Rumaila   Rumaila Operating Organization
2015 Supply and install of three Diesel Generators to the ROOHQ The SoW included; Supply and install three Generators 635/710KVA, with sunshade Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2015 Asphalt work at RSB fly camp Car Park The SoW included: Paving works at RSB fly camp car park, the work include ground preparation works and asphalt surfacing Basra/ South Rumaila   Rumaila Operating Organization
2015 RSB Spine Road Design and Construction, The SoW included: Construction of the new Spine Road connecting all facilities (RSB spine road) in south Rumaila. The work includes the install a manhole, Calvert bridge and road crossing backfilling Sub-base type B and A and paving asphalt with install a road barrier with road signage, Asphalt paving. Lamasat Al Mimar made Engineering and Construction.   Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2014 Enabling Works, Ph1 – North Rumaila The SoW included: Preparing the site for the construction Works including provision of filing materials with grading, leveling and compaction. SoW had included Topographic survey, soil investigation and reporting and final level design as well as other Engineering supporting for the construction Works (provided by others).   Basra/ North Rumaila   Rumaila Operating Organization
2014 Renovation of South and North Rumaila Road The SoW included: The work include a number of road repairs have been identified along the main spine road South and North the work repair road, covering and casing pipe and backfilling   Basra/ South & North Rumaila   Rumaila Operating Organization
2014 Repair the Village Road QA, The SoW included: Repair Spine main Village Road include Earth filling and concrete and asphalt paving, also Road Marking works for QA village road   Basra/ QA Village Rumaila Operating Organization
2014 RSB Spine Road – Road Ducting Manholes and Culverts, The SoW included: Construction of the underground ducting and manholes system for communications and power supply for the new RSB (Rumaila Supply Base) in south Rumaila. Works included both Engineering and Construction.   Basra/ South Rumaila   Rumaila Operating Organization
2014 The Main (Spine Road Area SR13 to SR14), The SoW included: Construction of the new Spine Road connecting all facilities (ROO HQ, DSs, CPSs, Well Heads. etc.) in south Rumaila. concrete work, road crossing, Corrugated steel pipes galvanized, hot dip bitumen coated, piped culvert in trench, Precast concrete construction, Earth work activity, cast manhole and supply with installation with paving asphalt, Lamasat Al Mimar made both Engineering and Construction.   Basra/ South Rumaila   Rumaila Operating Organization
2013 Tekfeen Camp The SoW included: Provision of Infrastructure for the project Tekfeen Camp [(Civil, Mechanical and Electrical, and  Concrete Sewage Tank)] in/ ROO HQ   Basra/ South Rumaila   Rumaila Operating Organization
2013 Power & lighting design& installation at ROO- RSB The SoW included: Power & lighting design& installation at ROO- RSB the work includes (Engineering, Procurement and Construction) Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2013 Power & lighting design& installation at ROO- HQ The SoW included: Power & lighting design& installation at ROO- HQ the work includes (Engineering, Procurement and Construction) Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2013 Enabling Works, Phase 2 – ROO HQ The SoW included: Survey, Procurement and Construction – Enabling Works – ROO HQ, South Rumaila.   Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2012 Supply and Install of five Diesel Generators to the ROOHQ The SoW included: Work is supply and install five Generators 635/710KVA with Synchro the work is part of BS/FM planned replacement programme include additional work to enhance the Babylon power Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2012 Construction of Sinbad Camp- ROO HQ Engineering, Design, The SoW included: Procurement and Construction infrastructure work (Civil, Mechanical and Electrical) – ROO HQ.   Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2012 FSA temporary Fly Camp MEP, Southern Rumaila The SoW included: Engineering, Procurement and Construction of Accommodation and Offices compound (Civil, Mechanical and Electrical)   Basra/ South Rumaila   Rumaila Operating Organization
2012 Project Qarmat Ali Camp The SoW included: QA Camp the work includes Engineering, procurement and construction (enabling infrastructure work (Sewage, portable water and power (Civil and mechanical work) Basra/ Qarmat Ali Water Treatment Plan Rumaila Operating Organization
2012 Project Center Camp- Accommodation & Associated Facilities- ROOHQ The SoW included: Engineering, Procurement and Construction of Accommodation and Offices compound (Civil, Mechanical and Electrical) – ROO HQ.   Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2012 Official Rec Building in CPS3 north Rumaila The SoW included: Work backfilling with compaction and build new building use brick material Compound (Civil, Mechanical and Electrical)   Basra/ North Rumaila   Rumaila Operating Organization
2011 Ducting and inspection pits system around ROOHQ phase 2, The SoW included: Work Survey, excavation with leveling cast blinding concrete, supply and install precast concrete manhole with laying duct pipes for ELV   Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2010 Project Camp- Accommodation & Associated Facilities- ROOHQ The SoW included: Engineering, Procurement and Construction of Accommodation and Offices compound (Civil, Mechanical and Electrical) – ROO HQ phase zero [ Supply 18 No room accommodation units, 2 No office units, 1No welfare with furniture.   Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2010 Construction of (20*50) m2 warehouse for BP main office in north Rumaila. Basra/ North Rumaila     Mott MacDonald
2010 Ditch & Berm works for BP company The SoW include: Excavation, Backfilling with copmation Basra/ South Rumaila ROOHQ Rumaila Operating Organization
2009 Provision of extending for the Sky-Link Arabia accommodation camp in BIA, The SoW included: including provision of accommodation buildings, parking areas and underground services.   Basra/ Airport   Sky‐Link Arabia – Basra branch
2009 Basra Business Centre- Basra Airport Mott MacDonald
2008 Forensic Lab- Basra Hakimia Mott MacDonald
2007 Supplying  of 20 brand new  500kva Diesel Generators to UNDP Corp- Basra Mott MacDonald
2007 Modifying and Extending of the main road of Basra – Zubayr- Basra Governorate
2007 PJCC Building no, 8 – British Army- MND (camp hall) /Warren- Basra Hakemia Mott MacDonald
2007 Underground utilities for Warren Site- Basra Hakemia Mott MacDonald
2006-2007 Executing Hamdan concrete bridge /-Basra Government- Basra Governorate
2006-2007 Execute Warren Utilities Project- MacDonald CO- Basra Hakemia Mott MacDonald
2006 PJCC Building no 3 -British Army- MND (Special Works) –Warren- Basra Hakemia Mott MacDonald
2006 Reconstruction of Building no 4- Warren Project- MacDonald CO- Basra Hakemia Mott MacDonald
2006 PJCC Building no 3 – British Army- MND (Emergency staircases) -Warren. Basra Hakemia Mott MacDonald
2006 Reconstruction &execution of  multi buildings- Warren Project- MacDonald CO- Basra Hakemia Mott MacDonald